behind the meter
Energy storage or generation located on the customer side of the utility meter, such as in homes or commercial buildings, rather than on the grid side.
As defined in 64 | Ramez Naam on Renewable Energy and an Optimistic Future
Other definitions
Energy infrastructure installed on customer's side of utility meter; operates independently from grid, typically for on-site power generation or storage
Doomberg Stops by the Energy News Beat Channel
Where it comes up · 6
- Zach Dell - Powering the Future - [Invest Like the Best, EP.434]3 claims
- China is killing the US on energy. Does that mean they’ll win AGI? — Casey Handmer2 claims
- Dwarkesh Patel Podcast - Dylan Patel — Deep dive on the 3 big bottlenecks to scaling AI compute2 claims
- From SpaceX to Founders Fund to Solving America's Nuclear Fuel Problem2 claims
- 64 | Ramez Naam on Renewable Energy and an Optimistic Future1 claim
- Doomberg Stops by the Energy News Beat Channel1 claim
Most important claims · 10 of 11Search all claims for “behind the meter” →
- Grid storage will be roughly split between centralized (at solar/wind plants) and edge storage (homes, offices, malls, substations), because edge batteries provide extra benefits like outage backup and using local distribution lines that are full at peak (4-8 PM) but empty at midnight—filling batteries with cheap midnight wind and draining at peak—analogous to caching at the edge of a software network.64 | Ramez Naam on Renewable Energy and an Optimistic Future
- Behind-the-meter distributed batteries can be landed on the grid significantly cheaper per kilowatt-hour and faster than utility-scale batteries, because they sit where the grid already exists and bypass the interconnection queue.Zach Dell - Powering the Future - [Invest Like the Best, EP.434]
- The grid performs spatial arbitrage—transporting power near-instantaneously from where it's cheap to where it's expensive—while batteries perform temporal arbitrage, storing power at one time of day and releasing it at another; batteries can therefore substitute for the grid's function, and being installed behind the meter they cannibalize the grid operator's most expensive, lowest-utilization assets, shrinking the average distance electrons travel between generation and consumption.China is killing the US on energy. Does that mean they’ll win AGI? — Casey Handmer
- Utility-scale batteries are constrained by interconnection queues and transmission congestion, since the best load centers cannot host large battery farms, whereas placing batteries behind the meter at homes uses existing grid connections and sits co-located with load.Zach Dell - Powering the Future - [Invest Like the Best, EP.434]
- Data centers can go behind the meter by building their own on-site power, a fenced island that never touches the grid, and this can also benefit host communities: if a data center adds about 100 MW of power to a gigawatt-scale campus, it can lower local utility prices, so 'bring your own energy' is a no-brainer for hyperscalers seeking to be welcomed.From SpaceX to Founders Fund to Solving America's Nuclear Fuel Problem
- Base installs a battery at the home for about $500 upfront plus about $16 to $17 per month, bundling backup power with retail electricity that saves customers roughly 10 to 20 percent on their bill, and the batteries also serve as grid resources.Zach Dell - Powering the Future - [Invest Like the Best, EP.434]
- Reactor designs fall into three size buckets with different markets: gigawatt-scale reactors (e.g., Westinghouse AP1000) for the grid, roughly 100 to 300 MW small modular reactors (SMRs) likely to find a niche behind the meter at data centers over 5 to 10 years, and roughly 1 MW microreactors for remote communities and military installations that displace diesel generators.From SpaceX to Founders Fund to Solving America's Nuclear Fuel Problem
- Batteries cycle predictably nearly every day (~300 days/year) because the sun rises daily and demand peaks at dusk, giving high utilization, whereas the most expensive high-voltage grid assets like substations and transformers exist for rare peak events and have very low utilization—so grid operators face an aging asset base being cannibalized by behind-the-meter batteries they cannot control, with rising operating costs and falling utilization.China is killing the US on energy. Does that mean they’ll win AGI? — Casey Handmer
- Power will not be the binding US constraint because beyond the three combined-cycle gas turbine makers there are 16+ gas power-gen vendors plus aeroderivatives, medium-speed reciprocating engines, ship engines, fuel cells (Bloom), and solar-plus-battery; even doubling power cost to ~$3,500/kW only raises a GPU's TCO a few cents/hour, and utility-scale batteries could unlock ~20% of the terawatt-scale US grid that sits idle outside peak hours.Dwarkesh Patel Podcast - Dylan Patel — Deep dive on the 3 big bottlenecks to scaling AI compute
- Building 200 GW/year strains labor (electricians, plumbers), so the main solution is modularization—shipping fully integrated power, cooling, and server-row 'skids' built in Asian factories—plus importing high-skilled labor and eventually robots, drastically cutting on-site cabling and headcount so build capacity can scale.Dwarkesh Patel Podcast - Dylan Patel — Deep dive on the 3 big bottlenecks to scaling AI compute