Fast tracking

Running design and construction at the same time so that building starts before plans are finished, with design staying one step ahead of construction.

As defined in #168 Larry Miller (Driven: An Autobiography)


Where it comes up · 1
  • #168 Larry Miller (Driven: An Autobiography)2 claims

Most important claims · 2 of 2Search all claims for “Fast tracking” →
  • Facing losses of $2 million, then $4 million, then $6 million a year in the old arena, Miller had to build the Delta Center in 16 months using fast tracking, where design and construction overlap, and the arena was completed in 15 months and 24 days, the fastest construction of a major U.S. arena.#168 Larry Miller (Driven: An Autobiography)
  • Fast tracking means the owner's concept, the architect's design, the engineers' calculations, and construction all occur at the same time, with planning staying one step ahead of construction, so that a floor can be poured in one corner while another corner is being excavated.#168 Larry Miller (Driven: An Autobiography)