Gansu is building high-voltage direct current (HVDC) transmission lines to send more than 30% of its wind energy to cover 20 provinces, but these lines are expensive to build and maintain, lose power in transit over long distances, and represent a major cost factor in wind power delivery.
causalpending
Speaker
Matt FerrellEvidence Quote
“the province is in the process of building several high-voltage direct current (HVDC) transmission lines to send more than 30 percent of the wind energy to cover 20 provinces. These top-of-the-line transmission lines weren't cheap to build nor are they cheap to maintain. Plus, some power is lost in transit, and over such a great distance this can really add up.”